Tseung Kwan O Development Phase 3
Remaining Reclamation in the Town Centre Extension,
Stage 2 and Associated Main Drainage Works

(Contract No. TK45/2000)
China Civil, Road & Bridge Joint Venture
將軍澳第二期開發
填海和主排水工程

(合約號TK45/2000)
中國土木工程集團公司/中國路橋聯營體

CLIENT
New Territories East Development
Territory Development Department

CONSULTANT
Maunsell Consultants Asia Ltd

CONTRACT VALUE
HK$367 Million

CONSTRUCTION PERIOD
2000-2003

JOINT VENTURE
China Civil Engineering Construction Corporation & China Road & Bridge Corporation Joint Venture (Leader: China Civil Engineering Construction Corporation)

業主
拓展署新界東拓展辦公室

工程顧問
茂盛工程顧問(亞洲)有限公司

合約額
3.67億港元

工期
2000年至2003年

聯營
中國土木工程集團公司 /
中國路橋總公司聯營體
(牽頭公司:中國土木工程集團公司)

 

SCOPE OF WORKS
This contract is a part of the Tseung Kwan O New Town Development blue printed by the Territory Development Department.
  The works in this Contract involve:
  (a) Reclamation and land formation for parts of Planning Areas 67, 68 and 72.
  (b) Installation of 1,500,000m prefabricated band drains in parts of Planning Areas 67, 68 and 72.
  (c) Construction of part of the Southern Seawall together with associated 250,000 m3 dredging.
  (d) Construction of sections of Western Box Culverts of a total length of 566m (ie, Box Culvert Nos 1, 2 and 3 and 4), each of sectional dimension 28-31m x 6m.
  (e) Preloading works.
  (f) Piling works for Box Colvert Nos 1, 2 and 3, and Desilting Compound; and
  (g) Construction of Desilting Compound.

  工程範圍
拓展署為開發將軍澳新市鎮而實施本工程。
  本合約工程計有:
  - 至部分規劃區67, 68和72之內的填海工程
  - 至部分規劃區67, 68和72之內鋪設1,500,000米的預制排水帶
  - 建造南防波堤,疏浚250,000m3
  - 建造西部箱涵,總長566m(及1,2,3和4號箱涵),截面為28-31m 寬 x 6m 高
  - 預壓回填工程
  - 1, 2和3號箱涵的打樁工程和清淤池 - 建造清淤池

Home
History & Background
Corporate Mission Statement
Strength & Establishment
E-mail
Health & Safety System
Quality Management System
Environmental Protection System