PROJECT HIGHLIGHTS
The project includes the design
and execution of piling and pile caps to foundations and site works
for the Redevelopment of Yau Tong Estate Phase 2 for the Hong Kong
Housing Authority.
It consists of:
-The
design and execution of 54 nos of 2.3m diameter bored pile and pile
caps to foundations to sustain the imposed loads for two 41-storey
Harmony 1 (option 5) blocks.
-The
construction of a single-storey compound transformer and switch
room and associated external works.
-Modification
of an existing platform.
|
|
項目要點
本合約為香港房屋委員會油塘重建第2期房屋基礎工程的打樁和樁帽工程,包括設計和施工,計有:
- 設計並建造54個直徑2.3米鑽孔灌注樁,作為 兩座41層高和諧式住宅樓(方案5)的基礎。
-建造一座單層變電開關房及其室外工程。
-既有平臺改造。 |