Redevelopment of Sam Yuk Middle School, Phase 1
三育中學

CLIENT
General Conference Corporation of Seventh-Day Adventists

ARCHITECT
Ho & Partners Architects, Engineers & Development Consultants Ltd

CONTRACT VALUE
HK$106 million

CONSTRUCTION PERIOD
1995-1997

業主
基督復臨安息日會

則師
何顯毅建築工程師樓
地產發展顧問有限公司


合約額
1.06億港元

工期
1995年至1997年

 

Design & build package for erection of a secondary school building including a cafeteria, kitchen and auditorium building, three staff quarter buildings and associated E&M installation and external works with total gross covered floor areas of 13,512m2.

 PROJECT HIGHLIGHTS
 Scope of Work includes:
 1. Caisson piling with pile caps;
 2. A 4-storey school building with 28 classrooms, a canteen on the ground floor, and an assembly hall/gymnasium on the floor above;
 3. A 4-storey student dormitory building with 240 beds that includes a multipurpose hall and flats for two deans on the ground floor;
 4. Three blocks of 4-storey staff quarters with 28 units of various sizes;
 5. A single-storey sewage treatment plant;
 6. A single-storey LPG store;
 7. A single-storey transformer and switch room; and
 8. Hard & soft landscaping works, site formation works, and including slope protections work.

 

設計並修建一座中學樓,包括餐廳,會議樓,宿舍樓,三棟員工宿舍樓,及相應的機電設備安裝和室外工程,總建築面積約13,512平方米。
 專案要點
 工程包括:
 - 沉箱樁和樁帽;
 - 一座4層教學樓,28間教室,底層有一餐廳,二樓有會議室和健身房;
 - 一座4層學生宿舍樓,240個床位,一個多功能廳,底層有兩套校長宿舍;
 - 三座4層員工宿舍樓,28個不同大小的單元;
 - 一座單層污水處理廠;
 - 一座單層液化石油氣站;
 - 一座單層變電房;以及
 - 綠化工程,包括護坡工程。