The contract is for the construction of a 4-storey residential building.
It consists of:
* The construction of a 4-storey residential building with a
total of 12 flats.
* With associated mechanical and electrical work.
PROJECT HGIHLIGHTS
The site was a small site and with a slope at the back. Special
treatment to the existing slope was required to suit the requirement
of government department. Besides, the timing for construction of
a large underground fire service watertank was expected long due
to the underground rock stratum.
|
|
本合同為興建一座4層高住宅樓
*興建一座有12套住房之4層住宅樓
*機電設備安裝
項目要點
本工地狹小,背後有一斜坡,需按政府要求進行特別處理,此外,由于岩石構造,花費了較長時間修建一個大型地下消防水池。
|